|
|
|
|
|
|
|
Theater right |
|
The right wall, ceiling, and front wall. The first installation was 5/8" dry wall board, followed by a taping, followed by sound caulking for all the rest of the seams including top and bottom, followed by installation of resilient channel.
|
|
|
|
|
|
|
|
|
|
|
|
Left Wall |
|
This is the wall just to the left as you enter the theater. This wall is 8 1/2" thick and has four total sheets of drywall. This is the wall separating the theater from the rest of the basement. |
|
|
|
|
|
|
|
|
|
|
Left Wall and Ceiling |
|
Resilient channel clearly visible here. The RC adds 1/2" inch to the thickness of the walls.
|
|
|
|
|
|
|
|